{"id":1896,"date":"2025-06-02T08:30:28","date_gmt":"2025-06-02T06:30:28","guid":{"rendered":"https:\/\/www-vial.wp2.hcweb.dev\/?p=1896"},"modified":"2025-06-02T08:32:35","modified_gmt":"2025-06-02T06:32:35","slug":"zoning-plan-bjerkreim","status":"publish","type":"post","link":"https:\/\/www-vial.wp2.hcweb.dev\/en\/reguleringsplan-bjerkreim\/","title":{"rendered":"Zoning plan Bjerkreim"},"content":{"rendered":"<p>Zoning plan with impact assessment for 2,500 acres of commercial area for power-intensive industries such as data centres and battery production. Upgrading and establishment of 7 km of access road to road standard with parallel GS road and bridge over stream. Work process that has a completion time of min. 2 years, was completed in 1 year thanks to the use of VDC design methodology. Delivery of a planning programme, planning maps, planning provisions, illustration plans, 3D models, rigging and ground protection plan, ROS analysis and water and sewerage framework plan. Preparation of technical reports on traffic analysis, mass management, long-term population growth and area requirements, technical infrastructure and route analysis. Assistance was also provided with several other technical reports in connection with the EIA. <\/p>\n\n\n\n<p>Role: The entire design responsibility for the customer with Project Manager, Area Planner, Subject Managers for Road, VA, LARK, VDC and BIM. Administration of subcontractors on Fire Engineering, Noise, EIA subjects such as natural resources, pollution, biodiversity, outdoor life, ecosystem services, cultural heritage and cultural environment, social impact, energy consumption and solutions, land use, climate and the subjects geology, ground conditions, landscape, cooling water and surplus energy. The application for a licence was carried out after the first plan proposal was adopted in 2021.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Value for the customer<\/h2>\n\n\n\n<p>Zoning plan with impact assessment carried out at 50% of the time when the project was carried out with a parallel process of zoning and impact assessment using VDC methodology. This entailed close interaction with technical subjects and the investigation phases where Vial collaborated with Bjerkreim municipality, Ecofact, Brekke &amp; Strand AS and GrunnTeknikk AS. &nbsp;<\/p>\n\n\n\n<p>Summary of the project:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Parallel processes regulation and KU<\/li>\n\n\n\n<li>Zoning plan with impact assessment (IA)<\/li>\n\n\n\n<li>2500 daa large forest area<\/li>\n\n\n\n<li>372 follow-up cases completed in 1 year<\/li>\n\n\n\n<li>Approx. 28 subject areas\/subject reports<\/li>\n\n\n\n<li>Close project follow-up every week using Planner<\/li>\n\n\n\n<li>Update of progress plans every month<\/li>\n\n\n\n<li>Overview with Project<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Zoning plan with impact assessment for 2,500 acres of commercial area for power-intensive industries such as data centres and battery production. Upgrading and establishment of 7 km of access road to road standard with parallel GS road and bridge over stream. Work process that has a completion time of min. 2 years, was completed in 1 year thanks to the use of VDC design methodology. Delivery of planning programme, planning maps, planning provisions, illustration plans, 3D models,...<\/p>","protected":false},"author":5,"featured_media":1897,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[36],"tags":[],"class_list":["post-1896","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-vial-energy"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Reguleringsplan Bjerkreim - Vial<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Reguleringsplan Bjerkreim - Vial\" \/>\n<meta property=\"og:description\" content=\"Reguleringsplan med konsekvensutredning for 2500 m\u00e5l n\u00e6ringsomr\u00e5de til kraftkrevende industri som datasenter og batteriproduksjon. Oppgradering og etablering av 7 km adkomstveg til vegstandard m\/parallell GS-veg og bru over bekk. Arbeidsprosess som har en utf\u00f8relsestid p\u00e5 min. 2 \u00e5r, ble gjennomf\u00f8rt p\u00e5 1 \u00e5r takket v\u00e6re bruk av VDC-prosjekteringsmetodikk. Leveranse av planprogram, plankart, planbestemmelser, illustrasjonsplaner, 3D-modeller,&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www-vial.wp2.hcweb.dev\/en\/zoning-plan-bjerkreim\/\" \/>\n<meta property=\"og:site_name\" content=\"Vial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/vialvial\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-02T06:30:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-02T06:32:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www-vial.wp2.hcweb.dev\/wp-content\/uploads\/2025\/05\/Reguleringsplan-Bjerkreim_Bilde1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"\u00d8yvind Engedal\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u00d8yvind Engedal\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/reguleringsplan-bjerkreim\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/reguleringsplan-bjerkreim\\\/\"},\"author\":{\"name\":\"\u00d8yvind Engedal\",\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/#\\\/schema\\\/person\\\/4c583e4d1320a110e6e11867ea656768\"},\"headline\":\"Reguleringsplan Bjerkreim\",\"datePublished\":\"2025-06-02T06:30:28+00:00\",\"dateModified\":\"2025-06-02T06:32:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/reguleringsplan-bjerkreim\\\/\"},\"wordCount\":259,\"publisher\":{\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/reguleringsplan-bjerkreim\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Reguleringsplan-Bjerkreim_Bilde1.jpg\",\"articleSection\":[\"Vial Energy\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/reguleringsplan-bjerkreim\\\/\",\"url\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/reguleringsplan-bjerkreim\\\/\",\"name\":\"Reguleringsplan Bjerkreim - Vial\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/reguleringsplan-bjerkreim\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/reguleringsplan-bjerkreim\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Reguleringsplan-Bjerkreim_Bilde1.jpg\",\"datePublished\":\"2025-06-02T06:30:28+00:00\",\"dateModified\":\"2025-06-02T06:32:35+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/reguleringsplan-bjerkreim\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/reguleringsplan-bjerkreim\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/reguleringsplan-bjerkreim\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Reguleringsplan-Bjerkreim_Bilde1.jpg\",\"contentUrl\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Reguleringsplan-Bjerkreim_Bilde1.jpg\",\"width\":1920,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/reguleringsplan-bjerkreim\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Hjem\",\"item\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Vial Energy\",\"item\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/kategori\\\/vial-energy\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Reguleringsplan Bjerkreim\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/#website\",\"url\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/\",\"name\":\"Vial\",\"description\":\"Planlegging av infrastruktur og byggeteknikk\",\"publisher\":{\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/#organization\",\"name\":\"Vial AS\",\"alternateName\":\"Vial\",\"url\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/vial-logo-roed.svg\",\"contentUrl\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/vial-logo-roed.svg\",\"width\":142,\"height\":77,\"caption\":\"Vial AS\"},\"image\":{\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/vialvial\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www-vial.wp2.hcweb.dev\\\/#\\\/schema\\\/person\\\/4c583e4d1320a110e6e11867ea656768\",\"name\":\"\u00d8yvind Engedal\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Zoning plan Bjerkreim - Vial","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_GB","og_type":"article","og_title":"Reguleringsplan Bjerkreim - Vial","og_description":"Reguleringsplan med konsekvensutredning for 2500 m\u00e5l n\u00e6ringsomr\u00e5de til kraftkrevende industri som datasenter og batteriproduksjon. Oppgradering og etablering av 7 km adkomstveg til vegstandard m\/parallell GS-veg og bru over bekk. Arbeidsprosess som har en utf\u00f8relsestid p\u00e5 min. 2 \u00e5r, ble gjennomf\u00f8rt p\u00e5 1 \u00e5r takket v\u00e6re bruk av VDC-prosjekteringsmetodikk. Leveranse av planprogram, plankart, planbestemmelser, illustrasjonsplaner, 3D-modeller,&hellip;","og_url":"https:\/\/www-vial.wp2.hcweb.dev\/en\/zoning-plan-bjerkreim\/","og_site_name":"Vial","article_publisher":"https:\/\/www.facebook.com\/vialvial\/","article_published_time":"2025-06-02T06:30:28+00:00","article_modified_time":"2025-06-02T06:32:35+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/www-vial.wp2.hcweb.dev\/wp-content\/uploads\/2025\/05\/Reguleringsplan-Bjerkreim_Bilde1.jpg","type":"image\/jpeg"}],"author":"\u00d8yvind Engedal","twitter_card":"summary_large_image","twitter_misc":{"Written by":"\u00d8yvind Engedal","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www-vial.wp2.hcweb.dev\/reguleringsplan-bjerkreim\/#article","isPartOf":{"@id":"https:\/\/www-vial.wp2.hcweb.dev\/reguleringsplan-bjerkreim\/"},"author":{"name":"\u00d8yvind Engedal","@id":"https:\/\/www-vial.wp2.hcweb.dev\/#\/schema\/person\/4c583e4d1320a110e6e11867ea656768"},"headline":"Reguleringsplan Bjerkreim","datePublished":"2025-06-02T06:30:28+00:00","dateModified":"2025-06-02T06:32:35+00:00","mainEntityOfPage":{"@id":"https:\/\/www-vial.wp2.hcweb.dev\/reguleringsplan-bjerkreim\/"},"wordCount":259,"publisher":{"@id":"https:\/\/www-vial.wp2.hcweb.dev\/#organization"},"image":{"@id":"https:\/\/www-vial.wp2.hcweb.dev\/reguleringsplan-bjerkreim\/#primaryimage"},"thumbnailUrl":"https:\/\/www-vial.wp2.hcweb.dev\/wp-content\/uploads\/2025\/05\/Reguleringsplan-Bjerkreim_Bilde1.jpg","articleSection":["Vial Energy"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www-vial.wp2.hcweb.dev\/reguleringsplan-bjerkreim\/","url":"https:\/\/www-vial.wp2.hcweb.dev\/reguleringsplan-bjerkreim\/","name":"Zoning plan Bjerkreim - Vial","isPartOf":{"@id":"https:\/\/www-vial.wp2.hcweb.dev\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www-vial.wp2.hcweb.dev\/reguleringsplan-bjerkreim\/#primaryimage"},"image":{"@id":"https:\/\/www-vial.wp2.hcweb.dev\/reguleringsplan-bjerkreim\/#primaryimage"},"thumbnailUrl":"https:\/\/www-vial.wp2.hcweb.dev\/wp-content\/uploads\/2025\/05\/Reguleringsplan-Bjerkreim_Bilde1.jpg","datePublished":"2025-06-02T06:30:28+00:00","dateModified":"2025-06-02T06:32:35+00:00","breadcrumb":{"@id":"https:\/\/www-vial.wp2.hcweb.dev\/reguleringsplan-bjerkreim\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www-vial.wp2.hcweb.dev\/reguleringsplan-bjerkreim\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www-vial.wp2.hcweb.dev\/reguleringsplan-bjerkreim\/#primaryimage","url":"https:\/\/www-vial.wp2.hcweb.dev\/wp-content\/uploads\/2025\/05\/Reguleringsplan-Bjerkreim_Bilde1.jpg","contentUrl":"https:\/\/www-vial.wp2.hcweb.dev\/wp-content\/uploads\/2025\/05\/Reguleringsplan-Bjerkreim_Bilde1.jpg","width":1920,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/www-vial.wp2.hcweb.dev\/reguleringsplan-bjerkreim\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Hjem","item":"https:\/\/www-vial.wp2.hcweb.dev\/"},{"@type":"ListItem","position":2,"name":"Vial Energy","item":"https:\/\/www-vial.wp2.hcweb.dev\/kategori\/vial-energy\/"},{"@type":"ListItem","position":3,"name":"Reguleringsplan Bjerkreim"}]},{"@type":"WebSite","@id":"https:\/\/www-vial.wp2.hcweb.dev\/#website","url":"https:\/\/www-vial.wp2.hcweb.dev\/","name":"Vial","description":"Planning of infrastructure and building technology","publisher":{"@id":"https:\/\/www-vial.wp2.hcweb.dev\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www-vial.wp2.hcweb.dev\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www-vial.wp2.hcweb.dev\/#organization","name":"Vial AS","alternateName":"Vial","url":"https:\/\/www-vial.wp2.hcweb.dev\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www-vial.wp2.hcweb.dev\/#\/schema\/logo\/image\/","url":"https:\/\/www-vial.wp2.hcweb.dev\/wp-content\/uploads\/2024\/01\/vial-logo-roed.svg","contentUrl":"https:\/\/www-vial.wp2.hcweb.dev\/wp-content\/uploads\/2024\/01\/vial-logo-roed.svg","width":142,"height":77,"caption":"Vial AS"},"image":{"@id":"https:\/\/www-vial.wp2.hcweb.dev\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/vialvial\/"]},{"@type":"Person","@id":"https:\/\/www-vial.wp2.hcweb.dev\/#\/schema\/person\/4c583e4d1320a110e6e11867ea656768","name":"\u00d8yvind Engedal"}]}},"_links":{"self":[{"href":"https:\/\/www-vial.wp2.hcweb.dev\/en\/wp-json\/wp\/v2\/posts\/1896","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www-vial.wp2.hcweb.dev\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www-vial.wp2.hcweb.dev\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www-vial.wp2.hcweb.dev\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www-vial.wp2.hcweb.dev\/en\/wp-json\/wp\/v2\/comments?post=1896"}],"version-history":[{"count":5,"href":"https:\/\/www-vial.wp2.hcweb.dev\/en\/wp-json\/wp\/v2\/posts\/1896\/revisions"}],"predecessor-version":[{"id":1919,"href":"https:\/\/www-vial.wp2.hcweb.dev\/en\/wp-json\/wp\/v2\/posts\/1896\/revisions\/1919"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www-vial.wp2.hcweb.dev\/en\/wp-json\/wp\/v2\/media\/1897"}],"wp:attachment":[{"href":"https:\/\/www-vial.wp2.hcweb.dev\/en\/wp-json\/wp\/v2\/media?parent=1896"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www-vial.wp2.hcweb.dev\/en\/wp-json\/wp\/v2\/categories?post=1896"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www-vial.wp2.hcweb.dev\/en\/wp-json\/wp\/v2\/tags?post=1896"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}